We specialize in ground-up New Construction in the Central Florida area. Our Project Management Team employs a ?hands-on? approach when working a project. Our Project Managers and Field Supervisors work closely with the General Contractor & Owner to ensure the project is delivered on time, in a safe manner, and to the G.C. & Owner?s satisfaction.Schwenn Services has completed hundreds of New Construction projects. We pride ourselves in our quality of work, timely performance, and ability to meet the challenges that New Construction projects create. As a family-owned company, we apply a higher standard to our workmanship. Quality Control is very important to us, so we have personnel designated to make sure our finished product is above standard.
For Estimating and Project Management Services please contact:
Jeff Schwenneker
Email: Jeff@schwennservices.com
Office: 407.895.7550
Cell: 321-299-3277
Please feel free to look through some of our Completed Projects
Social Security Administration ? Orlando:
- Owner: Lambry Properties
- General Contractor: Lamm & Co. Partners
- Mechanical Engineer: Eirmann Engineering, Inc.
Project Facts:
- 50,000 sq. ft Office Space
- 27 Carrier Rooftop Units
- Carrier CCNWeb Web Based Control System
Schwenn Services Scope of Work:
SSA Orlando is the largest Social Security office in Central Florida. The CCNWeb Control System gives the Owner control over the HVAC system from any device with internet access. Indoor Air Quality is controlled by CO2 Sensors and modulating Outside Air Dampers which keeps indoor CO2 below 880 parts per million.
D.R.M.P. Office Building
- Owner: Colonial Development
- Construction Manager: Lamm & Co. Partners
- Mechanical Engineer: Eirmann Engineering
- Sq. Ft 85,000
- 17 Carrier Rooftop Units
- 29 Carrier Split Systems
Schwenn Services Scope of Work:
DRMP is a 3-story office building located in Baldwin Park, FL. Our Refrigerant Piping crews installed over 2,200 feet of copper refrigerant pipe and our Duct Installation crews installed over 24,000 sq. ft. of fiberglass ductwork. The Building Management System overlays the entire mechanical system over the building?s floor plan to allow the customer?s I.T. Department to monitor and make changes to the Air Conditioning systems.
County Road 535 Water Supply Facility
- Owner: Orange County Government
- Construction Manager: Wharton-Smith
- Mechanical Engineer: Bobes & Associates Consulting Engineers
Project Facts:
- Facility houses Two (2) 300 gallon Sodium Hypochlorite tanks
- Addison Split System for Control Center
- Fiberglass Reinforced Pipe (FRP) exhaust duct
- Aluminum generator shroud
Schwenn Services Scope of Work:
CR 535 WSF had a unique set of features that provided a challenge that Schwenn Services is perfectly suited to accommodate. FRP exhaust duct was used to evacuate the Sodium Hypochlorite vapors and the usage of custom aluminum shrouds and stainless steel hardware makes for an aesthetically pleasing and corrosion proof final product.